Chelsea opens taps for water treatment renos

October 10th,2025 | News

On Oct. 1 Chelsea awarded a $660,071 contract to GBI Experts-conseils Inc. to engineer and supervise the expansion of the plant. Photo: Low Down Files

Chelsea has awarded a contract for the expansion of its drinking water treatment plant.

On Oct. 1, during the last meeting held by this council before elections in November, Chelsea awarded a $660,071 contract to GBI Experts-conseils Inc. to engineer and supervise the expansion of the plant.

“Chelsea wishes to increase the capacity of its current membrane plant in addition to resolving the issue of membrane clogging,” stated the call for tenders released on Sept. 2.

Chelsea is facing ongoing issues with its water treatment system and is looking for ways to improve capacity. Since 2024, the municipality has had a moratorium on new construction in the centre-village to prevent water and sewage demand from exceeding what the municipality can provide. 

“The municipality’s sewer and waste-water treatment system may no longer be sufficient to meet demand, particularly during certain peak periods that exceed its capacity,” read the resolution passed in November 2024 to enforce the moratorium. 

The update to the plant would add a pre-treatment filter to remove sediment from water entering the plant, according to Mayor Pierre Guénard. He said this was the solution recommended to the municipality to stop filter membrane clogging and extend the life of the filters within the plant. Chelsea will also add additional filters to expand plant capacity. 

Guénard said the plant was built with expansion in mind and is already prepared for the installation of an additional filtration system.

At the meeting, council also gave final approval to a bylaw that will add fees to building permits for developers to help cover the cost of the water treatment plant expansion in addition to the cost of borrowing money. Chelsea said in June that nearly $10 million will be needed for the expansion of the drinking water treatment system and $16 million for the sewage system.

According to the bylaw, current centre-village residents will pay, alongside fees collected from developers, for existing system upgrades, as both parties will benefit. The cost of expanding the system will be borne by future taxpayers through the fees levied on the developers at the time of the permit application. 

The exact fee attached to each new building permit will be determined by the size of the building permit application. The municipality has said that this is to ensure that the cost for the expansion will be shared between current and future tax payers so that the expansion of the municipal water treatment system doesn’t benefit future residents at an expense to current residents.

In other business, council:

  • approved the construction of four flashing pedestrian crosswalk signs for $35,012;
  • extended the allowed temporary car shelter – tempos – installation period by one month, now concluding May 15;
  • proposed changing the fine for tempo installation beyond the permitted date from $1,000 to $200 for a first offence.

Latest Headlines

Valley Voices

A gondola to Gatineau Park. Really?

While we applaud the National Capital Commission (NCC) for its creativity in coming up with new and innovative attractions for the National Capital Region, we have to question both the necessity and the wisdom of a proposed gondola stretching from downtown Ottawa to...

Opinion

How Bill 21 affected a community

We already know how Bill 21 affected students in Chelsea after an elementary school teacher was removed from her class for wearing a hijab in 2021. Now, the Parti Québécois is pushing the controversial bill even further, targeting not only teachers, but elementary students who wear religious symbols in school.

Hard-hitting local news delivered right to your mailbox (or in your inbox!)

Support local, independent journalism.

 

Print + Digital Subscriptions

Digital Subscription

Please log in to view content.

Support local, independent journalism.

 

Print + Digital Subscriptions

Digital Subscription

Please log in to view content.